PG Slots Production Technology for Other Disciplines

Production Technology for Other Disciplines

 
Production Technology for Other Disciplines

About the course

This course introduces a broad array of important daily Production Technology practices to team members. Emphasis is upon proven technology required to effectively develop and operate an asset in a multidiscipline development environment. Participants work several exercises such as basic artificial lift designs, acidizing programs, gravel pack designs, and fracturing programs. Shale gas and oil development challenges are thoroughly explained. Horizontal and multilateral technology is presented.

 

Course Objectives

  • Apply and integrate production technology principles for oilfield project development
  • Choose basic well completion equipment configurations
  • Perform system analyses (Nodal Analysis) to optimize well tubing design and selection
  • Perform basic artificial lift designs
  • Apply the latest shale gas and oil extraction technologies
  • Understand the chemistry and execution of sandstone and carbonate acid jobs
  • Design basic sand control gravel pack completions
  • Evaluate well candidate selection to conduct a hydraulic fracturing campaign
  • Apply new production technology advances for smart well completions
  • Maximize asset team interaction and understand the important dynamics between production technology and other team member disciplines

 

 

Course Content

  • Role and tasks of production technology
  • Completion design
  • Inflow and outflow performance
  • Artificial lift well completion systems (beam pump, gas-lift, ESP, PCP, plunger lift)
  • Formation damage and well acidizing
  • Perforating practices
  • Sand control
  • Hydraulic fracturing
  • Shale gas and oil development
  • Smart well completions
  • Field surveillance and data

 

Who Should Attend?

Exploration and production technical professionals, asset team members, team leaders, line managers, IT department staff who work with data and support production applications, data technicians, executive management, and all support staff who require a more extensive knowledge of production technology and engineering.

5 Days

Course Fees (VAT Included)

Lagos/PH/Abuja: ₦ 537,500.00

UK/US/Ghana/Dubai: $ 5,375.00

TRAINING PACK 

  • Award of Certificate.
  • Professional Training Materials

 

REGISTRATION PROCEDURE

  1. Go to “Register Now” button and fill the form and send it. You will get “message sent” if it is successful.
  2. You will get confirmation of your registration within two working days when you will be asked to go ahead and make payment.
  3. Go ahead and make payment.
  4. Send your name, phone number, email address, training location, amount paid to info@sbtpetroleum.com.ng OR SMS to +2349098171437.
  5. Upon confirmation of your payment, an electronic receipt will be sent to your mail.
  6. A joining instruction will be sent to you at least 72 hours before the training date an time.
  7. Looking forward to training date to commence your training. However, if a need to change the dates of the training arises, you will be notified immediately. This may be due to unavailability of the instructors or due to unavoidable logistic challenges.

 

ACCOUNT DETAILS

NAIRA ACCOUNT

BANK:                           ECOBANK

ACCOUNT NAME:       SBT PETROLEUM GEOSCIENCE LIMITED

ACCOUNT NUMBER:  1613062169

BRANCH:                     Chevron Branch

SORT CODE:               050150340

 

DOLLAR ACCOUNT

BANK:                           ECOBANK

ACCOUNT NAME:       SBT PETROLEUM GEOSCIENCE LIMITED

ACCOUNT NUMBER: 1613062183

BRANCH:                     Chevron Branch

SORT CODE:               050150340

Your Full Name
Phone Numbers
Email
Company Name
Choose Your Location
Training Request
Choose Your date
X
× Chat with Us on Whatsapp