PG Slots Cement Integrity Assurance and Evaluation

Cement Integrity Assurance and Evaluation

 
Cement Integrity Assurance and Evaluation

About the Course

The cement sheath behind the casing is the first barrier between the reservoir and the surface. Any failure, either during the placement or in the first hours following the cement job, can lead to catastrophic consequences related to safety and costs related to safety and environment. The cement sheath integrity is also a key factor controlling the life of the well. The development of fluid migration paths in the annulus or fractures can dramatically shorten the life of the well and reduce its value.

Therefore, it is extremely important to understand and control drilling, cementing, and well completion parameters, all of which can affect the integrity of the cement sheath for the entire life of the well.

 

Course Objectives

  • Course participants will take part in a detailed review of the cementing processes, cement sheath evaluation, and discussion of various measurement methods and interpretation techniques.
  • Remedial cementing theory and practical application of squeeze methods will be covered so that if the primary cement job is not successful the participants will understand how to repair or correct a cement integrity failure.

 

Course Content

Cementing Objectives and Importance of Mud Removal

    • Introduction to cementing, Cement rheology, Mud displacement

Importance of Temperature for Proper Design Plus Cement Evaluation

    • Temperature determination, Temperature simulation
    • Cement evaluation – logging tools and interpretation

Annular Fluid Migration and Cement Defects

    • Consequences of gas migration, Paths for gas migration
    • Cement slurry to solid transition effects, Migration prevention
    • Flow path effects

Mechanical Properties of Set Cement, Lab Testing, and Use of Ultrasonic Imaging Tool

    • Overview of mechanical properties of solids, Laboratory testing of cement
    • Important properties for long term integrity, Ultrasonic imaging tool (USIT)

Remedial Cementing

    • Squeeze cementing theory and objectives
    • Running vs. hesitation squeezes, Well preparation

Recommended practices and misconceptions

 

Who Should Attend?

This course will be most useful to drilling, production, and completion engineers.

5 Days         

                                   

 Course Fees (VAT Included)

Lagos/PH/Abuja: ₦ 430,000.00

UK/US/Ghana/Dubai: $ 4,300.00

TRAINING PACK 

  • Award of Certificate.
  • Professional Training Materials

 

REGISTRATION PROCEDURE

  1. Go to “Register Now” button and fill the form and send it. You will get “message sent” if it is successful.
  2. You will get confirmation of your registration within two working days when you will be asked to go ahead and make payment.
  3. Go ahead and make payment.
  4. Send your name, phone number, email address, training location, amount paid to info@sbtpetroleum.com.ng OR SMS to +2349098171437.
  5. Upon confirmation of your payment, an electronic receipt will be sent to your mail.
  6. A joining instruction will be sent to you at least 72 hours before the training date an time.
  7. Looking forward to training date to commence your training. However, if a need to change the dates of the training arises, you will be notified immediately. This may be due to unavailability of the instructors or due to unavoidable logistic challenges.

 

ACCOUNT DETAILS

NAIRA ACCOUNT

BANK:                           ECOBANK

ACCOUNT NAME:       SBT PETROLEUM GEOSCIENCE LIMITED

ACCOUNT NUMBER:  1613062169

BRANCH:                     Chevron Branch

SORT CODE:               050150340

 

DOLLAR ACCOUNT

BANK:                           ECOBANK

ACCOUNT NAME:       SBT PETROLEUM GEOSCIENCE LIMITED

ACCOUNT NUMBER: 1613062183

BRANCH:                     Chevron Branch

SORT CODE:               050150340

Your Full Name
Phone Numbers
Email
Company Name
Choose Your Location
Training Request
Choose Your date
X
× Chat with Us on Whatsapp